Commercial facilities · Vendors · Technology

For building owners and operators

Why buildings get hot—and what to do in the right order.

Heat enters, moves through the building and must leave outdoors. ICY maps that path, measures where removal falls behind and fixes known faults before recommending more equipment.

Heat entersHeat moves + buildsHeat leaves outdoorsThe room is rechecked

The physics before the purchase

Start with the balance—not the equipment.

Replacing a failed part may be necessary and still leave the space hot. ICY compares every major heat gain with the actual removal path: return air, coil, refrigerant circuit, condenser, supply delivery and the pressure relationships that can pull outdoor heat back inside.

Integrated commercial heat-balance diagram showing why a building gets hot, how heat moves through it, where cooling equipment rejects the heat and what to correct in order
One cause-and-effect viewConceptual explanation—not a diagnosis, load calculation, engineering seal or authorization for regulated work. Exact site evidence controls the scope.

From physics to an accountable decision

Five records a business can act on.

The technical detail stays available, but the decision remains simple: what is happening, what supports it, what happens next, who owns each task and what result closes the job.

01
Observe

Name the condition.

Where, when and under which operating state the space fails.

02
Measure

Show the imbalance.

Heat gain, airflow, pressure, controls and removal capacity in context.

03
Sequence

Correct in order.

Reduce avoidable load, restore movement, recover capacity, then fill a measured gap.

04
Assign

Put names on the work.

Owner, tenant, qualified trade, schedule, budget boundary and escalation path.

05
Verify

Check the occupied room.

Repeat the agreed measurements under the condition that caused the complaint.

A clear answer can include an unknown

Do not turn a theory into a fact.

ICY keeps observations, measurements, working explanations, business impacts, owner decisions and verified outcomes separate. That makes it clear why the next dollar should be spent and what still needs to be measured.

Trade licensing, stamped design, equipment-specific diagnosis and regulated work remain with the responsible qualified party for the exact scope and jurisdiction.