Find out why both functions are operating before switching one off.

Start with the intended function and a common timeline. The useful result is a verified explanation and, where needed, a correction that still satisfies temperature, moisture and ventilation requirements.

Published and reviewed by Gulf Coast Technologies, LLC. Sources, corrections and review method.

Recognize the pattern

  • Overlapping heating and cooling commands
  • Supply conditions do not match commanded state
  • Comfort is maintained but runtime or energy use is unexplained

Systems that may be involved

  • Intended dehumidification and reheat
  • Different zone demands or approved operating modes
  • Sensor, schedule or sequence problems
  • Valve leakage or physical response different from command

First useful evidence

  • Approved sequence and current overrides
  • Aligned mode, command, feedback and temperature trends
  • Qualified checks of actual equipment response
  • Baseline and acceptance target before changes

Expensive shortcuts to avoid

  • Disabling all reheat without checking moisture control
  • Treating a command as proof that a valve shut
  • Claiming savings from a short trend without a valid baseline

Questions worth separating

Is simultaneous heating and cooling always a fault?

No. The intended function matters. Establish it before deciding that the overlap is unnecessary.

Can a zero command prove a valve is closed?

No. Physical response needs verification with appropriate safe measurements.

Can runtime alone establish savings?

No. Use a suitable measurement-and-verification approach and account for changed conditions.

Source trail

Check the basis for this guide.

New source links and claims reviewed November 4, 2026. A source explains the stated mechanism; it does not diagnose a particular building or endorse ICY.

Pacific Northwest National Laboratory

Guides to Re-Tuning Measures

Economizer suitability depends on conditions and controls; damper command is not outdoor-air fraction; Some reheat serves dehumidification; excessive simultaneous heating and cooling needs sequence-based investigation

Read the primary source
U.S. Department of Energy

HVAC Commissioning

Functional verification; equipment and controls; dampers and schedules; ventilation and delivered airflow

Read the primary source
U.S. Department of Energy Federal Energy Management Program

Measurement and Verification Options for Federal Energy- and Water-Saving Projects

Baselines; retrofit isolation; whole-building verification; calibrated simulation

Read the primary source
Use the record to define the next qualified check.

These observations are starting points. Applicable local requirements, manufacturer instructions and the responsible qualified provider control hazardous or regulated work.